Empower engineers

Elevate MEP design

Accelerate coordination

The construction industry demands increasingly complex MEP systems while allowing only limited time for design and coordination.

Errors in MEP drafting and coordination are sources of productivity loss and schedule delays.

83% of MEP coordination process is repetitive work

6 months on average that MEP coordination needs to start ahead of ground-break to avid delays

Our solutions automate MEP drafting and conflict resolution, reducing MEP coordination time by over 65%.

Due to tight delivery timelines, the first acceptable MEP layout often becomes the final one used for construction.

The lack of optimization and metadata in these layouts is a primary cause of over-procurement and material waste.

Zero MEP layouts are reviewed for global optimization before being sent for construction

Zero MEP quantity analyses are based on the final coordinated MEP layouts

Our solution optimizes MEP layouts to eliminate unnecessary materials and provides precise quantity measurements for procurement.

Our solutions have been tested by industry experts from leading MEP engineering firms and renowned general contractors on projects ranging from high-rise commercial buildings to mission-critical infrastructure.